BIM Consulting Lessons from a Power Plant Project

By , Marketing 

Edwin Guerra, BIM Consultant recently presented – BIM Consulting Lessons from a Power Plant Project – at the CanBIM Saskatchewan Satellite session.

This presentation focused on the role of the BIM Consultant as a QA/QC independent third party for this project which involved the design and construction of a new below grade campus Power Plant to LEED Gold standards on the existing Lions Gate Hospital campus (2 levels). The project is currently under construction.