SolidCAD Insights

After Vault: When PDM Isn't Enough and PLM Starts to Matter

Written by SolidCAD | Nov 20, 2026, 8:59:35 PM

Getting engineering data into Vault is a big step. Files are controlled. Revisions are tracked. The wrong drawing stops reaching the shop floor.

Then a different kind of question starts arriving, usually from outside engineering.

Purchasing wants to know which assemblies use a part that's going end-of-life. Quality wants to see every change made to a product in the last year, with approvals. Manufacturing wants the BOM before the drawings are released. A supplier needs a drawing, but not a Vault seat.

Vault can answer some of these. Others are signs that your data management needs have grown beyond engineering files.

PDM and PLM solve different problems

Product data management (PDM) is about controlling engineering data: CAD files, drawings, versions, revisions and the relationships between them. Its users are mostly engineers and designers. Autodesk Vault is PDM.

Product lifecycle management (PLM) is about the product as a whole, across departments: items and BOMs, change processes, quality records, suppliers and project milestones. Its users include engineering, but also purchasing, quality, manufacturing and management. Autodesk Fusion Manage is Autodesk's cloud PLM.

Most manufacturers need PDM first. Some then need PLM. Very few need PLM instead of PDM.

Signs you're ready to extend beyond Vault

Change orders still happen outside the system. Files are in Vault, but the ECO itself — request, review, approval, implementation — still runs on email and spreadsheets.

Item and BOM data lives in too many places. Engineering has one BOM, ERP has another, and someone reconciles them by hand.

Other departments need engineering data but don't use CAD. Quality, purchasing and production are asking engineers for information instead of looking it up.

External partners need controlled access. Suppliers or contract manufacturers need the current drawing, and the answer today is an email attachment.

Audits are getting harder. Customers or regulators want a traceable history of product changes, not just file versions.

Ways to extend, from smallest step to largest

Vault add-ons. Vault Professional supports Items and Change Order capabilities that bring item records and formal ECO workflows inside Vault. For many teams this is the right next step.

Controlled sharing with outside parties. Tools that give suppliers and partners access to released drawings without a full Vault licence close the email-attachment gap.

PLM with Fusion Manage. When change processes, BOMs and quality workflows need to span departments, Fusion Manage provides cloud PLM. The Autodesk Vault Connector links Vault Professional with Fusion Manage, keeping items and bills of materials in sync and aligning property attributes across both systems.

The right step depends on who needs the information and what they need to do with it.

What to settle first

  • Is Vault itself healthy? PLM on top of an inconsistent Vault inherits the inconsistency. Check lifecycles, properties and categories first.
  • Who owns the change process? Formal ECOs need an agreed workflow and approvers before any system can enforce them.
  • What is the source of truth for items and BOMs? Decide whether engineering, PLM or ERP owns each piece of data, and how it flows between them.

Where SolidCAD fits

SolidCAD implements and extends Vault for Canadian manufacturers, from first deployment through change management and PLM. Because we work across the Autodesk manufacturing portfolio, we can recommend the smallest step that solves the problem you actually have — whether that's turning on ECO workflows in Vault or planning a move to Fusion Manage.

Frequently asked questions

What's the difference between PDM and PLM?

PDM controls engineering files and revisions. PLM manages the product across departments, including items, BOMs, change processes and quality.

Do we need PLM if we already have Vault?

Not always. Many manufacturers extend Vault with item and change order capabilities first, and only move to PLM when processes span several departments.

Can Vault and Fusion Manage work together?

Yes. With the Autodesk Vault Connector, Vault continues to manage CAD data while Fusion Manage handles cross-department processes, with items and BOMs kept in sync between them.

Where should we start?

With the process that causes the most friction today — usually engineering change.

Related reading

Next step

If your engineers are fielding more questions from purchasing, quality and production than they used to, your data management may be ready for its next step. SolidCAD can review your Vault environment and recommend what comes next.

Prefer email? Reach SolidCAD at info@solidcad.ca.

Talk to a SolidCAD manufacturing specialist.