Every estimate begins with the same unglamorous act. Somebody opens a set of drawings and starts counting.

Counting doors. Measuring runs of wall. Working out slab areas from a plan whose scale has to be verified first. It is skilled work, it is slow, and every number downstream depends on it. Get the quantity wrong and a perfect unit price produces a confidently wrong bid.

What has changed is not the need to count. It is that on most projects part of the answer already sits in a model somebody built, and most estimating workflows discard it.

The real problem is not measurement speed

Ask an estimator what costs them time and almost nobody says the measuring. They say:

Two sources of truth. The architect issued a model. The consultant issued PDFs. Some quantities are reliable from the model and some are not, and deciding which is which takes judgment that cannot be delegated.

Revisions that arrive mid-takeoff. A new sheet set lands on day four of a six-day turnaround. The question becomes which of yesterday’s measurements still hold.

Quantities that cannot be rolled up. Measurements are taken against the drawing, organized by sheet, while the estimate is organized by cost code. The reconciliation lives in a spreadsheet, usually the most fragile artifact in the pursuit.

Two of those three are organizational problems. A tool that only measures faster fixes the least expensive part.

Where Forma Takeoff sits

A naming note first. In March 2026, Autodesk Construction Cloud was renamed Autodesk Forma, which Autodesk described as a change of name rather than a migration, with “no data migration, no disruption to existing workflows, and no changes to licensing, integrations, or project data.” (Autodesk News, 24 March 2026) The quantification product now appears as Forma Takeoff.

Autodesk lists Forma Takeoff inside the Forma for Preconstruction bundle, alongside Forma Estimate, Forma Data Management, BuildingConnected Pro, Bid Board Pro, TradeTapp and ProEst. (Autodesk, Forma for Preconstruction)

What it actually does

Quoting Autodesk’s own capability statements, not paraphrases of them.

2D takeoff against the drawings. Autodesk describes the ability to “perform linear, count, or area takeoff with multiple quantity outputs.” (Autodesk, Forma Takeoff) Note multiple quantity outputs: one measured condition can yield several quantities, which is how a wall run becomes linear metres, area and a stud count without being measured three times.

Automated quantities from models. Autodesk describes the ability to “quickly generate quantities from building information models,” and positions the product as a way to “generate 2D and 3D quantities in one solution for competitive bids.” (Autodesk, Forma Takeoff) Where the structure is modelled and the finishes are not, which is most projects, the gain is not reconciling two processes by hand.

Custom classification systems. Autodesk states that users can “upload and apply multiple custom classification systems.” (Autodesk, Forma Takeoff) The least exciting item on the list and probably the most valuable. Classification is what lets quantities roll up to your cost codes rather than to the drawing’s organization: the spreadsheet problem, solved structurally.

Document distribution with version controls. Autodesk describes centralized document management for distributing the latest drawings and models with “robust version controls.” (Autodesk, Forma Takeoff) Precisely that, and no more: the page does not describe automatic comparison of takeoff quantities between drawing revisions.

Unit costs can also be added to 2D and 3D takeoff types, with “calculations update as quantities change.” (Autodesk, Forma Takeoff) That is conceptual estimating. Forma Estimate is a separate product that links cost, material and labour calculations to takeoff quantities.

One change to plan for

At Autodesk University 2026, Autodesk presented Connected Takeoff Sheets and Files, under which takeoff sheets move into the Forma Data Management Files tool, new projects first, with existing projects migrating shortly after release. Autodesk did not label it generally available, beta or coming soon. (Autodesk, Digital Builder)

Treat it as announced with timing unconfirmed. If you are standing up a template this quarter, ask your account team where it stands first.

Getting value out of it

Decide what the model is allowed to answer. A conversation between estimating and BIM, held before the first pursuit rather than during one. Which elements do you trust for quantity, which are indicative, and which do you still measure. Write it down. It will be wrong the first time, which is fine as long as it gets revisited.

Build the classification system that matches your cost codes. Not a tidied version of the drawing structure, and not a standard adopted because it was the default. If quantities do not land in your cost codes without manual handling, the spreadsheet comes back and takes the reliability with it.

Give the model producers something to work against. Most unusable model quantities are not modelling failures. They are the result of nobody telling the modeller the quantities would be used downstream. A short statement of what estimating needs fixes more than any configuration setting.

The counting was never the expensive part.

Where SolidCAD fits

The work that makes quantification stick is mostly not software work. It is agreeing on what the model may answer, building a classification system that reflects how your firm actually prices, and making the modeller to estimator handoff something other than an accident.

SolidCAD is an engineering technology implementation partner and a Symetri company.

Related reading

Beyond the bid: connecting contractors and trades

Next step

If your estimating process still starts from the drawings when a model exists, that is the conversation worth having. Talk to SolidCAD about where quantities come from on your next pursuit, at info@solidcad.ca.